The Missouri Department of Transportation will resume work on the Jacks Fork River Bridge on Route 17, Texas County, July 22. Crews will perform work on the bridge approaches, where the pavement and bridge join.
Traffic will be reduced to one-lane from 6:30 a.m. to 7 p.m., on Tuesday through July 24, weather permitting.
Traffic control devices will be in place during this operation to direct motorists. MoDOT urges motorists to proceed slowly through the work zone due to a one-lane restriction. Both travel lanes will be open to traffic each night.
