MoDOT logo

A portion of U.S. 63 in Texas County is reduced to one lane with a 10-foot width restriction as contractor crews resurface the asphalt. 

This section is located from Highway CC to Highway 32 in Licking. 

As construction is underway, flaggers will be present, and traffic will be guided through the work zone by a pilot car.   

Weather permitting, work will take place from 6 a.m. to 7 p.m. through Friday, Nov. 1.

The work zone will be marked with signs. Motorists are urged to use extreme caution while traveling near the area. 

For additional information, call Resident Engineer Audie Pulliam at 417-469-9028, MoDOT’s Customer Service Center toll-free at 888-ASK-MODOT (888-275-6636) or visit www.modot.org/southeast

Isaiah Buse has served as the publisher of the Houston Herald since 2023. He started with the organization in 2019, and achieved a bachelor's degree in business administration in 2023. He serves on the...

Leave a comment

Leave a Reply